Phoenix's Historic Preservation Office reviews exterior work that needs a building permit on a property listed on the Phoenix Historic Property Register, and interior work that does not affect the outside of the house does not need its approval. Minor exterior work, such as a rear patio cover or a deteriorated porch rebuilt in kind, gets a Certificate of No Effect from staff, often the day it is requested. Larger or street-visible changes need a Certificate of Appropriateness, which takes a pre-application meeting and a public hearing before an HP hearing officer. The city charges no review fee for either one.
For an owner in Willo, Encanto-Palmcroft, F.Q. Story, Roosevelt or Coronado, the details matter because a remodel rarely stays in one lane. A kitchen job moves a window, a bathroom wants a new vent, and a wall removal runs through a demolition permit. Whether the work needs a building permit at all is a separate question, answered in our guide to when a Phoenix remodel needs a permit. The historic layer sits on top of that permit: what the city's preservation staff look at, and which certificate applies.
How Do You Know If Your House Falls Under Phoenix Historic Review?
Look at the zoning. A property on the Phoenix Historic Property Register carries an "HP" or "HP-L" suffix on its base zoning, and the city's historic preservation FAQ names that suffix as one of two ways to tell. The other is the register itself, which the city established in 1986 and which now lists 36 residential historic districts alongside individual properties. A house inside a listed district is under review even if it was never listed on its own. The quickest lookup is the zoning layer on the city's My Community Map, or a call to the Historic Preservation Office at (602) 261-8699.
HP is the standard designation. Section 810 of the Zoning Ordinance designates a listed property by its underlying zoning "plus the suffix 'HP,'" and a landmark, which has to show "exceptional significance," carries "HP-L." A property gets on the register by being rezoned with the overlay, which is why the answer lives on the zoning map rather than in a list you might miss. The National Register of Historic Places is a separate, federal list. Willo is on both, with the National Park Service listing its styles as Bungalow and Craftsman, Tudor Revival and Mission or Spanish Revival, but the city's review follows the city's overlay.
Five central Phoenix districts at a glance
| District | Generally bounded by | Period of significance | On the register since |
|---|---|---|---|
| Willo | First to Seventh avenues, McDowell Road to the alley north of Edgemont Avenue | 1910 to 1950 | July 1990, expanded 2006 |
| Encanto-Palmcroft | Seventh to 15th avenues, McDowell Road to the north edge of Encanto Park and its golf course | 1920 to 1952 | March 1987, expanded 1999 and 2005 |
| F.Q. Story | McDowell Road, Roosevelt Street, Seventh and 17th avenues | 1921 to 1942 | March 1988, adjusted 2000 and 2004 |
| Roosevelt | McDowell Road, Fillmore Street, Central and Seventh avenues | 1895 to 1930 | September 1986, adjusted 1991, 1997 and 2004 |
| Coronado | Seventh to 14th streets, Virginia Avenue to the alley north of McDowell Road | 1907 to 1942 | November 1986, adjusted 2000 |
Boundaries and periods from the city's residential historic districts list. A house built after its district's period, or one altered heavily, may be classed as a noncontributor. The guidelines then go easier on the house itself, but it stays inside the review process.
What Does the Historic Preservation Office Review?
The outside of the house, when the work needs a permit. Section 811.E of the Phoenix Zoning Ordinance says: "No building, permanent sign, or other structure within an HP District may be erected, demolished, moved, restored, rehabilitated, reconstructed, altered or changed in exterior appearance until plans for such activities have been submitted to and approved by the Historic Preservation Officer, HP Commission or City Council, and a Certificate of No Effect, a Certificate of Appropriateness, or a Demolition Approval is issued." Section 812.A ties that to the permit counter: when a permit is sought to "alter, remodel, move, build or otherwise develop or landscape property" in an HP district, "issuance of the permit shall be deferred until after a Certificate of No Effect or a Certificate of Appropriateness is obtained." The full text sits in Chapter 8 of the Zoning Ordinance.
The city's Certificates of No Effect handout puts the scope in one sentence: "The certificate approval process applies only to exterior work that requires a building permit for properties listed on the Phoenix Historic Property Register." Staff decide which certificate a project needs, and they measure it against the General Design Guidelines for Historic Properties, adopted by the HP Commission in 1996 and last updated in 2023. Those guidelines follow the Secretary of the Interior's Standards for Rehabilitation, and the working version is short: keep the features that give the house its character, repair before replacing, and put additions at the rear, where the street can't see them.
The office does not issue building permits. The certificate application says a certificate "is not an actual city of Phoenix building permit," so the Planning and Development permit stays a separate step, filed after the historic approval when the work needs both.
Which Interior Work Skips Historic Approval, and Where Is the Catch?
Interior work that leaves the exterior alone. The Certificates of No Effect handout puts it plainly: "Interior work that does not affect the exterior of the building does not require approval from the Historic Preservation Office." A kitchen remodel, a bathroom taken to the studs, new floors, plaster repair, rewiring, or a wall moved inside the footprint needs no certificate. Each still needs whatever building, electrical or plumbing permit the work calls for.
The catches are where interior work brushes the outside, or where the permit desk wants a second look:
- The Building Official can still send you over.The same handout adds that "in some cases, the Building Official may refer the applicant to HP for this determination." That is the counter deciding whether your interior job reaches the outside.
- Interior demolition on a listed building gets an extra review.The city's demolition requests page says that for buildings on the register, "an additional Historic Preservation review is part of the permitting process for interior demolition permits." Taking out a wall runs on an interior demolition permit, so plan for that step in the calendar.
- Anything that comes through the roof or a wall.A new exhaust vent, a window that moves or gets added, a new exterior door, or a change to the roofline or roofing to make room for a beam is exterior work. Staff decide whether it fits a Certificate of No Effect or needs a hearing. Ask before the plans are drawn.
- Conservation easements.The FAQ's one exception to the ordinary-maintenance rule is a property under a conservation easement that requires extra review of work items.
- The over-the-counter path waits.Phoenix's over-the-counter permit guideline says projects that require historic review "cannot be permitted over the counter unless required approvals are first obtained."
For a kitchen or bath that stays inside, the path is the city permit, plus a short conversation with HP staff if anything touches the outside. Our kitchen remodeling and bathroom remodeling pages walk through those jobs, and the overlay does not change how the cabinets or the tile go in. Opening a wall is the interior job with the most moving parts in an older house, because houses in Coronado and Willo, with their stick-framed roofs, have real interior bearing walls, which our guide to telling whether a wall is load-bearing explains.
What Qualifies for a Certificate of No Effect?
Minor exterior work that staff can approve at the counter. Section 812.C of the Zoning Ordinance lets staff issue a Certificate of No Effect, or CNE, when the work is minor, clearly within the adopted guidelines, and will not "diminish, eliminate, or adversely affect the historic character" of the property or the district. The HP Commission keeps a list of projects eligible for CNEs, last approved May 20, 2024. The handouts say these certificates are frequently approved at the initial request or within a few days, and an approved CNE is good for one year.
Common projects on the city's CNE list
| Project | Qualifies for a CNE when |
|---|---|
| Patio cover or carport | Single-story rear patio covers and attached carports. Side carports and patio covers qualify when set back from the front, no wider than one car bay or a third of the front facade, open on three sides, simple, and lower than the house |
| Rear yard fence | No taller than 6 feet and at least 3 feet behind the front corner of the house on each side |
| A facade the public can't see | Minor changes, such as a rear window opening expanded down to the floor to become a door |
| Attic conversion | In the rear, with no visible impact from the street facades |
| Repair or restoration | Minor work in kind on a contributing property, such as rebuilding a deteriorated front porch in kind |
| Re-roof | Same material or an acceptable alternative, such as dimensional shingle for wood shingle, with no removal of the roof structure |
| Room addition | Footprint under 75 percent of the historic building's, entirely behind the rear facade and stepped in, one story at or below the existing roof with a ceiling plate of 9 feet or less, compatible roof and wall materials, and simple windows with visible light transmittance of 0.5 or higher |
| New accessory building or ADU | No variance needed, a location that fits the district, one story with a 9-foot or lower ceiling plate, and a footprint under 75 percent of the main house and no more than 1,000 sq ft |
| Converting a garage or other accessory building | New framing in the garage door opening set in to show the original opening, same footprint, siding and roof shape kept |
| Solar panels | Not street-visible, on the rear half of a hipped or gabled roof, or on a rear outbuilding |
A project that would make a property ineligible for the register, or turn a contributor into a noncontributor, is not approved as a CNE. Staff can approve other minor work case by case. A CNE settles only the historic side: an attic made habitable also has to meet the 2024 residential code, with a 30 psf floor live load against 10 or 20 for an attic nobody lives in (Table R301.5), a ceiling of at least 6 feet 8 inches (R313.1.2), and an emergency escape opening (R319.1), which is often the new window or dormer staff review.
When Does a Project Need a Certificate of Appropriateness, and How Long Does It Take?
When it can't be approved as a CNE. The Certificates of Appropriateness handout names new primary residences, large additions and other street-visible changes. The test in Section 812.D is that the work "will be compatible with the relevant historic, cultural, educational or architectural qualities characteristic of the structure, site or district," including "size, scale, massing, proportions, orientation, surface textures and patterns, details and embellishments and the relation of these elements to one another," plus conformance with the HP Commission's guidelines. Counting from a complete application, the city's own steps put a decision about a month out if nobody appeals.
- 1. A pre-application meeting, required.Send current photos, a site plan of everything on the lot, and conceptual drawings to historic@phoenix.gov or call (602) 261-8699. The handout asks for concept plans rather than finished construction drawings, because they are expected to change. The meeting stays valid for one year.
- 2. Zoning first, neighbors early.Check the zoning with Site Planning at (602) 262-7811 before the COA is filed, and get any variance or use permit first. The city strongly encourages a talk with the neighborhood association and the immediate neighbors.
- 3. Completeness and the hearing date.The planner rules on completeness within 10 days of receipt, and the hearing is set within 20 days of a complete application. The city posts a sign on the property for at least 10 days and mails the owner and the neighborhood association.
- 4. The staff report.The planner visits the site, may propose stipulations to bring the project within the standards, and sends the report to the applicant and the hearing officer three days before the hearing.
- 5. The hearing.The HP Hearing Officer approves, denies, continues or approves with added stipulations. The officer, the HP Commission and the City Council act quasi-judicially, so no calls, emails, texts or meetings with them outside the hearing. Extra material goes through HP staff.
- 6. Five days for appeals.Anyone aggrieved can appeal within five calendar days to the HP Commission, and a Commission decision can go to the City Council the same way. The Council's decision is final.
- 7. Stamped plans, then the permit.The earliest staff can stamp plans is the next business day after the appeal period, and only plans that show every stipulation. The stamped set then goes to the building permit.
Do Paint, Repairs and Windows Need Approval?
Paint and in-kind repairs don't. Section 811.F says nothing in the ordinance prevents "ordinary maintenance or repair of any structure in the HP District, which does not alter or modify the historic character of the structure." The FAQ says "As long as the materials and design are not changed, you do not need permission to paint, make repairs, or replace materials in kind," and its example is asphalt shingles replaced with asphalt shingles. The office "does not regulate paint colors." It does discourage painting masonry that was never painted, and the design guidelines rule out abrasive cleaning such as sandblasting in favor of the gentlest method that works.
Windows have their own rule. Since July 1, 2011, replacing windows as a stand-alone job no longer needs a building permit or HP review as long as certain conditions are met, which the city's Window Replacement Without a Permit Interpretation sets out. The CNE list adds the catch in the next sentence: window replacement that is part of a larger project needing a construction permit is still subject to HP review. So the windows in a whole-house remodel get reviewed, and the same windows done on their own may not. Where originals have to be replaced, the guidelines ask that the window pattern stay the same, that true divided lights not be swapped for simulated ones, and that the new sash not be narrower.
What Happens If Any Part of the House Comes Down?
It goes through a separate Demolition Approval, and part of a house counts. The city's demolition submittal checklist asks for a Request for HP Demolition Approval covering "the structure(s) or area(s) of a structure proposed for demolition," a close-up and a context photo of each, and a site plan when only a portion of a building is coming down. Section 813.A says no permit to "move or demolish all or any part of a house, building, or other structure" in an HP district issues without a demolition approval, and 813.B.2 gives the HP Officer three days to decide on two criteria: whether the structure "is of no historic or architectural value or significance and does not contribute to the historic value of the property," and whether its loss "would not adversely affect the integrity of the HP District." The ordinance's definition of demolish leaves out "solely interior elements or demolition that does not alter exterior features or demolition that is not visible from outside," which is why an interior wall doesn't need a Demolition Approval.
An HP Commission policy lets staff approve three kinds of demolition on their own: additions built after the period of significance or otherwise lacking significance, noncontributing properties, and modest accessory buildings with low preservation potential. The policy notes that old detached garages were often wood frame "rather than masonry and built directly on dirt or on a concrete slab with no footings," and gives a brick garage behind a brick house as the kind it does not cover. If a request is denied, the city cannot issue a demolition permit for one year from the denial, or three years for a landmark, unless a later demolition approval is granted. A hearing that weighs economic hardship is the route when staff can't approve a request.
Do Federal Lead Rules Apply Inside a Historic House?
Yes, and they reach the interior work the city leaves alone. Every district in this group has a period of significance ending by 1952, so the houses that make them historic were all built before 1978, the cutoff for the EPA's Renovation, Repair and Painting rule. Under 40 CFR 745.83, paid work that disturbs more than 6 square feet of painted surface per room inside, or more than 20 square feet outside, is a renovation rather than minor repair, and window replacement or demolition of painted surfaces never counts as minor. Jobs in the same room within 30 days count as one. Outside, 745.83 lists chimneys, railings, soffits and fascias among the components, and 745.85 has the firm close doors and windows within 20 feet and cover the ground 10 feet beyond the work, so a porch repaired in kind or repointing on painted brick runs under the rule too.
Opening a plaster wall for wiring, stripping a mantel or replacing a run of trim passes 6 square feet fast. The EPA's contractor page says the rule covers anyone paid to disturb paint in pre-1978 housing, "even sole proprietorships," and that a firm has to be certified to perform or advertise the work. Arizona is not one of the states the EPA has authorized to run its own program, so the EPA administers it here directly and the certification question is a federal one, fair to ask any bidder. The EPA's lead-safe firm search lists certified firms by location. Asbestos sits under a county rule instead, Maricopa County Rule 370, whose demolition and renovation section carries an exemption for a single owner-occupied house, and suspect materials get tested before anyone demolishes them.
Send Us the House
A photo of the street side, photos of the rooms you want to change, and a line on what you're after. We'll tell you which parts stay inside the house, which parts reach the outside and go to HP staff, and what the work runs.
Free Remodel EstimateWhat Does a Historic-District Remodel Cost Beyond the Review?
The review costs nothing: the city charges no fee for a Certificate of No Effect, a Certificate of Appropriateness or a Demolition Approval on a listed property. The money goes into the house. In a home from the 1910s to the 1940s that means testing before demolition, plaster and wood repair where newer houses get drywall and new flooring, and the same kitchen and bath work any Phoenix house gets. A full kitchen remodel in the Phoenix metro lands between $25,000 and $40,000, and a bathroom between $8,000 and $20,000.
| Item | Cost | What sets it |
|---|---|---|
| Certificate of No Effect review | $0, no review fee | Staff approval, often at the initial request. Valid one year |
| Certificate of Appropriateness review | $0, no review fee | The cost is time: pre-application meeting, hearing, five-day appeal period |
| Demolition Approval, listed property | $0, no review fee | A denial restrains demolition for one year, three for a landmark |
| Review for buildings that go through the 30-day demolition hold | $390 per review | The one review fee on the city's list |
| Lead paint inspection | $239 to $437 per inspection, national | National average $338. House size and the testing method |
| Lead risk assessment | $300 to $800 per assessment, national | A deeper look than an inspection, typically ordered after a confirmed case of lead poisoning |
| Asbestos test | $30 to $50 per sample, lab fee | The EPA's list includes vinyl floor tiles and sheet-flooring adhesives, vermiculite attic insulation, pipe wrap, roofing and siding shingles, and texture and patching compound from later remodels |
| Plaster repair, small areas | $10 to $80 per sq ft, national | Small repairs. Larger repairs can reach $100 per sq ft |
| Wood floor refinishing | $3 to $8 per sq ft, national | Oak runs $3 to $5 per sq ft. The whole room gets refinished so a patch disappears. Sanding an old finish is coating-disturbing work under the lead rule's definitions |
| Interior paint, walls, ceilings and trim | $3.25 to $4.50 per sq ft of floor area | Priced on the home's floor area. Plaster and old trim take more prep, and in a pre-1978 house sanding or scraping that prep past 6 sq ft a room is lead-rule work |
| Full kitchen remodel | $25,000 to $40,000 per kitchen | Whether the cabinets stay, whether the plumbing moves, whether a wall comes out |
| Custom kitchen with layout changes or structural openings | From about $40,000 per kitchen | The opening, the beam and the patching around it |
| Bathroom remodel | $8,000 to $20,000 per bathroom | Whether the drain moves. Cosmetic refreshes can land below the range |
Phoenix market rates for 2026. Rows marked national are national figures. Review fees from the Historic Preservation Office FAQ. The kitchen and bath ranges come from our kitchen remodel cost and bathroom remodel cost guides, and the asbestos test figure from our guide to remodeling after buying a house.
Plaster is the line to read closely. The National Park Service's guidance on historic interiors encourages repairing deteriorated plaster and accepts gypsum board where plaster is too far gone and the walls and ceilings are not highly ornamented. In practice a room keeps its sound plaster and gets its failed sections replaced, and a bid for an older house should say which of the two it prices. Our interior plaster finishes page covers the finish coats that suit an older wall.
What If the House Is in the State Historic Property Tax Program?
Then the state has a review of its own, and it reaches maintenance the city leaves alone. The State Historic Property Tax program, run by the Arizona State Historic Preservation Office and applied for through the county assessor, is open to non-income-producing properties listed on the National Register. The Maricopa County Assessor says a residential owner signs a 15-year agreement and the assessment ratio drops from 10 percent to 5 percent.
In return, SHPO's program overview says any maintenance, alteration, rehabilitation or restoration beyond normal housekeeping "that will affect any publicly visible areas of the property must be submitted to the SHPO" before the work starts, and the work has to meet the Secretary of the Interior's Standards. The certificate application reminds enrolled owners of the same thing. SHPO can disqualify a property that doesn't follow the program rules, and disqualified properties may face tax penalties, so call SHPO at (602) 542-4009 before the drawings are final. The city also funds exterior work: its Exterior Rehabilitation Grant Program helps owners of homes in city-designated districts, or individually listed on the register, rehabilitate them.
What Do Owners Ask About Remodeling in a Phoenix Historic District?
Does Phoenix Historic Preservation regulate paint colors?
No. The Historic Preservation Office says it does not regulate paint colors, and routine maintenance such as painting is excluded from its review. It does discourage painting brick or other masonry that was never painted, and the city's design guidelines ask for the gentlest cleaning method that works, which rules out sandblasting.
Do I need historic approval to remodel my kitchen in a Phoenix historic district?
Not if the work stays inside. Interior work that does not affect the exterior does not need Historic Preservation Office approval, although the kitchen still needs whatever building, electrical and plumbing permits the work calls for. A new window, a door out to the yard or a vent through the roof is exterior work, and that part goes to Historic Preservation staff before the permit is issued.
Is there a fee for a Certificate of No Effect or a Certificate of Appropriateness?
No. The city charges no review fee for a Certificate of No Effect, a Certificate of Appropriateness or a Demolition Approval on a property listed on the Phoenix Historic Property Register. The one review fee on the city's list is $390, charged to properties that have to go through the 30-day demolition hold.
How long is a Certificate of No Effect good for?
One year. Section 812.G of the Zoning Ordinance says all certificates expire one year from the date of issuance unless work is started within that time, so it makes sense to apply once the drawings are close to final rather than at the idea stage.
What is the difference between HP and HP-L zoning in Phoenix?
HP is the standard historic designation and HP-L marks a historic landmark. The eligibility criteria are the same, except that an HP-L property has to show exceptional significance. Landmarks get higher protection, including a three-year restraint on demolition after a denial instead of one year, and the highest priority for city financial incentives.
While the House Is Open for One Permit, What Else Is Worth Doing?
A remodel in an older house brings several trades to the same address at once, and their trucks are already out front. Add-ons settled before work begins ride on that setup and tend to come in 25 to 50 percent under their price as a separate job. Bring one up in week three and most of that saving is gone.
- Repair the plaster in the rooms next door. The plasterer matching a patch in the kitchen can take the cracks in the hall on the same visit, under the same lead-safe setup when the prep passes 6 square feet a room. See interior plaster finishes.
- Paint once. Repainting the rooms the remodel touched, plus the ones beside them, means one round of masking and one color decision. See interior painting.
- Settle the floors. If the original wood floors are still there, they can be refinished room to room while the furniture is already out. The EPA rule counts floors as components and any surface coating as a painted surface, so in a pre-1978 house the sanding is worth asking the EPA's lead line about first. See flooring.
- Bring the wiring forward. Walls are open and the electrician is already on the permit, which is the cheapest moment to replace old circuits and add outlets. See electrical work.
- Add the rear patio cover. A single-story cover at the back is on the city's CNE list. See patio covers and ramadas.
- Finish the front yard. Our desert front yard for a Coronado Historic District bungalow, with decomposed granite, two Desert Museum palo verdes, golden barrel cactus and a new concrete walkway, shows a low-water yard that fits a district full of period bungalows. See desert landscaping.
- Decide about the fireplace. Gas logs or an insert inside the firebox are interior work, and the liner cap at the top of the chimney is the part HP staff see. Our guide to converting a wood-burning fireplace lays out the options.
Text photos of the house and the rooms you want to change, or call (602) 492-1815, and we'll come back with a quick quote.